Installation & Commissioning

Hassle-Free Pump Station Installation – Done Right, Every Time

We know how important it is to get your pumped drainage system installed correctly — the first time. That’s why we handle both the mechanical and electrical installation ourselves. No split responsibilities, no chasing different contractors. Just one expert team taking care of everything.

How We Work

Step 1: Free Site Survey

Before we start, we visit your site at no cost. We check everything over and let you know if there’s anything that needs to be sorted beforehand. If extra work is needed, we’ll give you a clear quote — no surprises.

Before we start, we visit your site at no cost. We check everything over and let you know if there’s anything that needs to be sorted beforehand. If extra work is needed, we’ll give you a clear quote — no surprises.

Installation includes:

  • Fitting the pumps inside the chamber

  • Mounting the control and alarm panels close by (within 3 meters)

  • Connecting everything to your pre-installed isolators or spurs

  • You just need to make sure a cable duct with a drawcord is ready and runs from the chamber to within 500mm of the isolator/spur

Important: We don’t extend ducts, install cable trays, clip cables, or leave any cables in open trenches.

  • Chamber is clean and clear

  • Float switches move freely

  • Cables are safely tied and out of the way

  • Gate valves open properly

  • Pumps work correctly with water

  • Alarm sounds when it should

  • No leaks in pipework

  • Power and backup battery (if installed) work as expected

  • Everything is labeled and documented

Heads up: Before we start, chambers must be dry and debris-free. Manhole covers should be removable without tools or extra work — otherwise, there might be extra charges or a return visit.

What’s Not Included

We don’t handle civil works like lowering the chamber into place, external pipework, or digging — that’s usually handled by your builder or groundwork team.

If we can’t commission the system at the same time as installation, there may be an extra charge to come back.

A Smooth Handover – With Ongoing Support You Can Count On

Once the system’s up and running, we make sure the handover is just as smooth as the install. We’ll walk you through everything, and if you choose one of our service plans, you’ll get priority support plus a lifetime parts warranty on our most popular plan.

Need help later? We’re here 24/7, all year round — no hassle, no waiting.

Dedicated Communication

With Aquamova, you’ll have a single point of contact from start to finish. Our team knows the products inside-out and we track every job using our smart system — so whenever you call, we’ll know exactly what’s been done and what’s needed.