Hassle-Free Pump Station Installation – Done Right, Every Time
We know how important it is to get your pumped drainage system installed correctly — the first time. That’s why we handle both the mechanical and electrical installation ourselves. No split responsibilities, no chasing different contractors. Just one expert team taking care of everything.
How We Work
Step 1: Free Site Survey
Before we start, we visit your site at no cost. We check everything over and let you know if there’s anything that needs to be sorted beforehand. If extra work is needed, we’ll give you a clear quote — no surprises.
Step 1: Free Site Survey
Before we start, we visit your site at no cost. We check everything over and let you know if there’s anything that needs to be sorted beforehand. If extra work is needed, we’ll give you a clear quote — no surprises.
Step 2: Installation & Commissioning
Installation includes:
Fitting the pumps inside the chamber
Mounting the control and alarm panels close by (within 3 meters)
Connecting everything to your pre-installed isolators or spurs
You just need to make sure a cable duct with a drawcord is ready and runs from the chamber to within 500mm of the isolator/spur
Important: We don’t extend ducts, install cable trays, clip cables, or leave any cables in open trenches.
Step 3: Commissioning checks
Chamber is clean and clear
Float switches move freely
Cables are safely tied and out of the way
Gate valves open properly
Pumps work correctly with water
Alarm sounds when it should
No leaks in pipework
Power and backup battery (if installed) work as expected
Everything is labeled and documented
Heads up: Before we start, chambers must be dry and debris-free. Manhole covers should be removable without tools or extra work — otherwise, there might be extra charges or a return visit.
What’s Not Included
We don’t handle civil works like lowering the chamber into place, external pipework, or digging — that’s usually handled by your builder or groundwork team.
If we can’t commission the system at the same time as installation, there may be an extra charge to come back.
A Smooth Handover – With Ongoing Support You Can Count On
Once the system’s up and running, we make sure the handover is just as smooth as the install. We’ll walk you through everything, and if you choose one of our service plans, you’ll get priority support plus a lifetime parts warranty on our most popular plan.
Need help later? We’re here 24/7, all year round — no hassle, no waiting.
Dedicated Communication
With Aquamova, you’ll have a single point of contact from start to finish. Our team knows the products inside-out and we track every job using our smart system — so whenever you call, we’ll know exactly what’s been done and what’s needed.